Custom build

One boat at a time

Three hulls fit in the shed, but each has its own team and its own date. We do not build in batches.

Lengths
12 – 28 m
Build time
14 – 22 months
Deposit
20%
Stage payments
5

The point

Changing your mind is cheap, but only early

Moving a bulkhead on the drawing is an afternoon. Moving it after lamination is a month.

So the drawing phase runs three months and does not get shortened: heights, walkways, systems and weights are settled while an eraser is still the only cost.

After the first panel is cut the design freezes. Changes stay possible — on a custom boat they always happen — but they enter as written variations, with their own price and their own days.

How it runs

Five stages, from signature to launch

  1. 01

    Drawing

    General arrangement, weights and systems. You sign when all three agree.

    3 months

  2. 02

    Hull

    Jig, frames, lamination and deck. This is the part nobody ever sees again.

    5 – 7 months

  3. 03

    Systems

    Engines, shafts, electrical and hydraulic. Before the furniture, always.

    3 – 5 months

  4. 04

    Fit-out

    Joinery, leather, paint. This is where she starts to look like the drawing.

    3 – 6 months

  5. 05

    Trials

    Sea trials, tuning, a real passage. Then handover.

    2 weeks

Decided with you

The four choices that change the boat

A hand plane and shavings on the bench.
Welding sparks in the half-light of the workshop.

They come before any conversation about fabrics and colours. The rest can wait; these cannot.

  • How many cabins, and whether crew quarters are separate
  • Outboard or inboard — that changes the stern, not just the engine
  • Opening hard top or open flybridge: it changes the tonnage
  • Range required, which sets the tanks and therefore the weights
The full method

Included

What is in the price, and what is not

01

In the price

Hull, deck, systems, the quoted engines, interior fit-out to drawing, paint, sea trials and CE certification.

Always

02

Separate

Electronics beyond the base package, tender and crane, covers and exterior upholstery, transport outside the Mediterranean.

Quoted

03

Variations

Every change after the design freeze enters as a written variation, with price and days. No verbal variations.

On request

Questions

About building

How are payments staged?

Twenty per cent on signature, then four stage payments tied to verifiable milestones — hull closed, systems tested, fit-out complete, handover.

Each stage is paid after an inspection, not on a calendar date.

Can I bring my own designer?

Yes, and it happens often. We build to third-party drawings provided there is a single technical contact who owns the decisions.

What if you run late?

The contract carries a daily penalty after thirty days of delay not caused by the client.

In our last ten launches it happened once, over an engine delivery.

Can we see her during the build?

Whenever you like, with a day’s notice. At the five stage payments the inspection is written into the contract.

First meeting

The first meeting happens in the shed

An hour among open hulls says more than any presentation. Numbers come after.